Herulaneum, MO – 4,000 sq. ft.
August 8, 2008
Herculaneum Fire District built a new fire house. Archway Industrial Coatings prepared the concrete correctly and applied our epoxy broadcast system with our non-yellowing urethane topcoats. This fire house needed an extra thick floor due to the inpact abuse it would be receiving . They had experienced chipping and peeling due to other coatings being applied too thin. This extra thick industrial floor was the answer for them.